Kentucky EV charger installers
Residential Level 2
Commercial & fleet
DC fast charging
Multifamily & HOA
Get in touch
Have a question about EV charger installation, licensing, or how we verify installers? Send us a message and we will get back to you.
Our rating process
License check
We confirm the installer holds a current electrical license in the state where they operate.
EV-specific experience
We look for documented history installing EV chargers, not general electrical work alone.
Real customer feedback
Reviews come from public platforms, not from forms we control ourselves.
Service transparency
We verify what the installer actually offers, so listings reflect real capabilities.
By the numbers
Kentucky’s EV charging landscape has grown quickly over the past several years, though most of that growth has happened in a relatively small footprint of the state.
Kentucky has 406 public EV charging locations
AFDC lists 1,187 public ports.
Kentucky has 725 Level 2 and 458 DC fast ports
AFDC lists 4 Level 1 ports.
Kentucky NEVI planning covers FY2022–FY2026
Kentucky submits annual EV Infrastructure Deployment Plans.
Current fuel and energy prices
|
Fuel type
|
Current Kentucky average
|
Source
|
|---|---|---|
|
Residential electricity
|
13.81¢ / kWh
|
EIA, July 2026
|
|
Regular gasoline
|
$4.10 / gal
|
AAA, September 29, 2026
|
|
Mid-grade gasoline
|
$4.65 / gal
|
AAA, September 29, 2026
|
|
Premium gasoline
|
$5.09 / gal
|
AAA, September 29, 2026
|
|
Diesel
|
$6.29 / gal
|
AAA, September 29, 2026
|
Current fuel and energy prices
Electricity, at home
$3.45–$4.60
13.81¢/kWh × 3–4 mi/kWh (DOE efficiency data)
VS
Regular gasoline
$12.81–$14.64
$4.10/gal ÷ 28–32 mpg
You save per 100 miles
$8.21–$11.19
Charging infrastructure map
See where public charging is available before you plan your next trip or decide whether home charging makes sense for you.
Verified Kentucky installers
Frequently asked questions
Straightforward answers to what people usually ask before installing an EV charger or hiring an installer in Kentucky.
Yes. Kentucky requires electric-vehicle and plug-in hybrid owners to pay an annual fee in addition to standard vehicle-registration fees; electric motorcycles have a separate annual fee. The amounts are adjusted annually using the National Highway Construction Cost Index 2.0, so an older published fee should not be treated as the current renewal amount. Check the current Kentucky Transportation Cabinet or county clerk renewal information before paying, because the applicable annual fee changes with the index.
No statewide consumer rebate for purchasing or leasing an electric vehicle is listed in the U.S. Department of Energy’s current Kentucky laws-and-incentives summary. Kentucky’s current EV-related state entries focus on public charging grants, charging-station taxes, and infrastructure planning rather than a statewide vehicle-purchase rebate. That does not rule out federal incentives or programs offered by a utility, dealer, local government, or another administrator with separate eligibility and funding rules. Buyers should confirm the current program administrator, service area, funding status, and requirements before relying on an incentive.
Kentucky requires EV charging-station owners and lessees to pay an excise tax, plus a surtax when a charging station is on state property. Station operators add the tax to the electricity selling price. The rate is reviewed against the National Highway Construction Cost Index 2.0 each year and adjusted by January 1, subject to a maximum 5% annual increase or decrease, so customers should not rely on an older per-kWh tax amount. If a station provides free electricity, the operator is responsible for the tax on stations installed after June 30, 2022.
Kentucky participates in the federal National Electric Vehicle Infrastructure Formula Program. The Kentucky Transportation Cabinet has submitted annually updated EV Infrastructure Deployment Plans for fiscal years 2022 through 2026 describing how it intends to distribute NEVI funding and address related physical and cybersecurity requirements. Planned or funded sites should not be treated as operating chargers. Before a trip, drivers should verify a station’s live status, connector type, power level, payment method, and access conditions through the charging network or a live station map.